Exercise NavigatorCopilot Credits Cost Control
Review projected Copilot credit consumption and document threshold-based governance decisions.
OverviewCopilot Credits Cost Control
Review projected Copilot credit consumption and document threshold-based governance decisions.
Prerequisites
- Runtime config
- Threshold targets
- Current usage assumptions
Success Criteria
- Estimate reviewed
- Threshold decision recorded
- Export generated for sign-off
Guided StepsClick a step to open detailed instructions, examples, copy-ready text, and step-specific notes.
Completion gate
This step requires: notes
- Add step notes before marking this step complete.
How to complete this step
- Open the current runtime config or estimate source and confirm the projected credit value.
- Compare the projected value against the team or environment threshold used for release approval.
- Record whether the deployment is under threshold, close to threshold, or over threshold.
Example
Example: projected usage is 250000 credits, threshold is 1000000, and result is “under threshold with no immediate budget escalation required.”
Projected credits:
Threshold:
Decision:
Step notes
Upload or paste screenshots that are specific to this step.
Evidence CaptureUpload screenshots from disk, drag and drop them here, paste from clipboard, and keep evidence across refreshes.
Click here and press ⌘/Ctrl + V to paste an image
Evidence is stored locally in this browser and may be limited by browser storage quotas.
Limit: up to 6 images, 2 MB each, stored locally in this browser.
READYNo evidence added yetUploaded, dropped, or pasted screenshots will persist locally for this exercise.
ExportReview package export
Generate a completion summary with reviewer metadata, narrative governance sections, embedded screenshots, and step-level workflow details.